Machine Installation Guide

 

Once you are done placing the order, we tend to dispatch the product within 3-4 working days. We will ensure that you are constantly updated about the progress of your order. After you have received the Aroleap smart home gym equipment we will get in touch with you to schedule the installation.
 

About The Machine 

The Aroleap home gym is a device created to allow smarter workouts, right at home. With more than 150 exercises that you can do with this machine, every muscle group of your body can be targeted. AI powered training sessions will not only track your progress, but also suggest better methods of working out and give you real time tracking and insights. 

 

Tools Required for Installation

During the installation, our team will use the following tools to ensure sturdy mounting of the machine -

  1. Hammer Drill Machine
    • a - with SDS plus chuck/tool holder
  2. Wall Drill Bits
    • 8 mm
    • 13 mm
  3. Spanner
    • 13 mm
  4. Adjustable Wrench
    • 10 inch
  5. Allen Key
    • 3 mm
    • 4 mm
    • 6 mm
  6. Screwdriver
  7. Hammer

 

Things required from you during installation

In order to complete the installation properly, you will have to keep the following ready:

  1. Internet Connection

    You will need a strong and reliable WiFi connection that will allow for the streaming of audio and video.

  2. Power Outlet

    The machine needs a grounded, 3-prong power outlet (6A standard socket will be sufficient). The location of the power outlet needs to be within 4.5 feet of where the machine will be installed. In case the same is not available, you can make use of extension cords.

  3. Supporting Walls

    Aroleap can be easily installed on most solid brick and solid concrete walls.

  4. Space Required: A total of 4x2 square feet of wall-space will be needed. The ideal space requirement would be 6 feet along the wall on which the Aroleap is being installed (3 feet on either side from the centre of the machine) and another 6 feet outwards from the wall.

  5. Ceiling Height: The ideal height clearance is 7.2 feet, as this will allow for the complete extension of the adjustable arms of Aroleap.  However, the minimal space requirement would be 3.2 feet along the wall and 7.2 feet for the height.

 

 

Installation steps for the smartest home gym equipment

Aroleap is easy to install and will be up and running in minimal time.

Here are the steps that our installation team will follow to setup your home gym:

    1. Getting the machine out

      1. Once the box has been opened, the 10 bolts on either side of the front panel will be removed and the front panel will be taken out with care.
      2. The 4 nuts on the bottom of the frame will be removed next, which will allow for the removal of the machine from the packing box.

    2. Drilling holes on the wall

      1. Once the exact location of the machine has been determined, the marking for the drilling process can start.

      2. The device (without the front panel), has to be held firmly against the wall, ensuring that there is no gap between the device and the wall.

      3. Using a long thin pencil, the spots for drilling need to be marked through the frame. Our team will check to ascertain that the markings are absolutely precise.

      4. Now the machine can be kept aside and using the 8mm drill bit, the holes can be made. Then, using the 13mm drill bit, the holes can be enlarged for the anchor bolts.

    3. Installing anchor fasteners

      1. All the anchor fasteners have to be checked, before being installed and once placed in the drilled holes, they have to be tightened to the level that the threads are no longer visible.

      2. After the anchor fasteners have been inserted completely and tightened, the bolts can be removed.

    4. Mounting the machine

      1. Now the machine is ready to be mounted. Our technicians will ensure that the machine is aligned with the holes on the wall.

      2. Along with the 5mm thick spacers as required, the bolts can be fixed and this will allow for the machine to be properly bolted to the wall.

    5. Finally, the front panel will be installed and the bolts on the side of the device will be tightened with an Allen key.

    The ideal space requirement is 6 feet along the wall on which the Aroleap is being installed (3 feet on either side from the centre of the machine) and another 6 feet in front of the machine for the user to perform all possible exercises comfortably.

    Aroleap X